Verbal public comments may be submitted pursuant to the instructions noticed in the meeting agenda, which will be available at least 72 hours prior to the meeting at https://lossan.legistar.com/Calendar.aspx

File #: 17-317   
Type: Lossan Status: Agenda Ready - Regular Calendar
File created: 1/10/2019 In control: Technical Advisory Committee
On agenda: 1/17/2019 Final action: 1/17/2019
Title: Final Draft of the 2019 Los Angeles - San Diego - San Luis Obispo Rail Corridor Agency Legislative Program
Sponsors: Dustin Sifford
Attachments: 1. Staff Report, 2. Attachment A

Title

Final Draft of the 2019 Los Angeles - San Diego - San Luis Obispo Rail Corridor Agency Legislative Program

 

Overview

Annually, the Los Angeles - San Diego - San Luis Obispo Rail Corridor Agency adopts a legislative program to guide its legislative activities for the upcoming session.  A final draft of the 2019 Los Angeles - San Diego - San Luis Obispo Rail Corridor Agency Legislative Program has been prepared for consideration by the Board of Directors.

 

Recommendation(s)

Review and recommend the final draft of the 2019 Los Angeles - San Diego - San Luis Obispo Rail Corridor Agency Legislative Program to the Board of Directors for adoption.